West Woodburn · Elsdon · Kirkwhelpington

Twenty turbines of up to 230 metres on the moors above our villages.

Vattenfall wants to build Ray II next to the existing Ray Wind Farm. Its turbines would stand almost twice the height of the ones already here. We are not against renewable energy — we are against a project of this scale, in this place.

Why we object Get involved
125 m — already here House ≈8 m Ray I 125 m Ray II up to 230 m
Drawn to scale. Ray II could reach 230 m — around 105 m taller than the 125 m turbines already here, and higher than Blackpool Tower (158 m) or the London Eye (135 m).
See it from your home →
230 m
Maximum tip height
vs 125 m already on site
Up to 20
Turbines
on open moorland
≈160 MW
Capacity
plus battery storage
National
Decision
not the county council

The problem in one number

This is not "more of the same".

The turbines already on the Ray Estate are 125 metres to the tip of the blade. Vattenfall says Ray II could reach 230 metres — machines from a different generation, on the same skyline.

A 230-metre turbine is taller than any structure most people in Northumberland ever see. From the villages, the fells and the roads that thread between them, a line of them changes the character of the landscape completely — and once built, they are there for around 35 years.

See the full proposal and how the two schemes compare →

Why we object

Six concerns, grounded in the developer's own figures.

Overbearing scale

At up to 230 m, the turbines would be almost double the height of the existing wind farm and would dominate views for many miles.

Cumulative impact

Ray II would sit alongside Ray I and the many wind farms already built across this part of Northumberland. Enough is enough.

Battery storage risk

The scheme includes a large battery energy storage system. We are pressing for clear answers on fire safety and end-of-life decommissioning.

Peat and carbon

Building on upland moorland disturbs peat that stores carbon and supports rare habitat. The climate case must count what is lost, not just what is generated.

Living alongside it

Noise, shadow flicker, construction traffic and years of disruption fall on the same small communities, again.

A fair say

Because it is over 100 MW, Ray II is decided nationally. Local people have to organise early to be heard at all.

How the decision is made

A minister decides — so we must be organised.

Ray II is large enough to count as a Nationally Significant Infrastructure Project. That means it does not go to Northumberland County Council. It is examined by the Planning Inspectorate and decided by the Secretary of State through a Development Consent Order.

Vattenfall expects to submit its application around spring 2027, with consultation before then. Objections carry most weight when residents register early as Interested Parties and speak to the specific, local harms. That is what this campaign helps you do.

What you can do today

Add your name, and we will tell you exactly when and how to object.

The most effective time to act is before the application is submitted. Sign up now and we will keep you informed at every stage.

Sign up to stay informed